Río Grande River Pass-Through

|

Welding Technology

|

Right of Way





Four camps were installed along the pipeline trace, with an infrastructure for 750 people and space for keeping pipeline material, combustible, equipment and food. When the corresponding authorizations for the Right of Way were obtained, the trench opening started up. Once the vegetal bedspread was removed, it was stored up separately for its usage during the restoration labors.
 

           

 
 




 